(720) 572-8212

​​How Long Does It Take to Replace Kitchen Countertops?

​​How Long Does It Take to Replace Kitchen Countertops?

Upgrading your kitchen countertops is one of the quickest ways to update your kitchen without a full-scale renovation. Replacing outdated surfaces with granite, quartz, or other natural stone instantly adds durability, style, and long-term value. A simple countertop update can renew your entire kitchen — almost as if it were fully remodeled.

Natural and engineered stone surfaces remain the top choice for homeowners nationwide and in Colorado because they balance strength, low maintenance, and timeless appeal. Whether you’re planning a kitchen refresh in Littleton, Arvada, Lakewood, or anywhere across the Denver Metro area, understanding how the replacement process works — and how long it typically takes — can help you plan with confidence.

In this article, you’ll learn what affects countertop installation timelines, from measuring and fabrication to final installation day — plus why choosing a professional stone fabricator can make your kitchen upgrade smoother and more rewarding.

Looking for a Gorgeous Refresh to Your Kitchen?

Today’s kitchen design trends favor stone surfaces that blend beauty with performance. Homeowners are removing temporary materials like laminate in favor of granite, quartz, and other natural stones that offer lasting value and timeless appeal. Whether you love the consistent look of quartz or the natural movement of granite and marble, these materials define what’s in style for updated, modern kitchens today. A kitchen refresh is for anyone ready for an upgrade.

  • Value Efficiency – You want to know how many days your kitchen will be out of service.
  • Care About Budgeting – Timelines affect labor costs and your overall remodel budget.
  • Like to Plan Ahead – Coordinating work, family meals, and entertaining depends on knowing when your kitchen will be ready.
  • Seek Professional Insight – DIY projects are tempting, but professional timelines provide more accuracy and peace of mind.

If you’re in Denver, Arvada, Littleton, or the surrounding Front Range area, this breakdown shows you what to expect and how to prepare for a smooth kitchen countertop installation timeline.

What Impacts Countertop Replacement Timelines

Several factors can make a difference when you’re replacing your kitchen countertops regarding timelines. The material you choose for your countertop defines your kitchen’s look and influences the length of fabrication and installation. Expert countertop installers, like Kitchen and Bath by Design in Littleton, Colorado, fabricates and installs natural and engineered stone surfaces — including granite, quartz, marble, soapstone, and quartzite. Homeowners can visit the showroom to select their slab, and the same team that guides them through the design process handles the cutting, polishing, and finishing in-house before returning for professional installation.

Quartz — An engineered stone that’s precisely cut and polished to your kitchen’s exact template. Quartz offers exceptional durability, stain resistance, and consistent color. From measurement to installation, fabrication typically takes 2–3 weeks.

Granite — A natural stone that brings unique veining and depth to any kitchen. Because each slab must be carefully handled, sealed, and finished, fabrication and installation usually take 2–3 weeks.

Other Natural Stones (Marble, Soapstone, and Quartzite) — Natural stones are preferred because of their natural, high-end aesthetic. However, because they are natural, they may require specialized cutting, finishing, or sealing, and timelines vary between 2 and 4 weeks.

Your choice of edge detail, finish, and slab size can also add days to the schedule. For instance, a waterfall edge on an island requires more fabrication time than a simple straight edge.

1. Measuring & Templating

Professionals will take exact kitchen measurements before your new countertops can be fabricated. This step, called templating, ensures your counters fit perfectly around sinks, walls, and appliances.

The on-site visit usually takes 1–2 hours. Depending on availability, scheduling the appointment can add a few days to a week.

Once the template is created, it’s sent to the fabrication shop, where it guides the cutting process. At this stage, your countertops must be level — installers won’t template until the foundation is ready, so ensure everything is prepared correctly before scheduling.

2. Fabrication & Customization (Where Timelines Vary Most)

The fabrication stage is when raw slabs become finished countertops. This is often the lengthiest part of the process.

  • Stone (Granite/Quartz) – Cutting, polishing, and edging typically take 7–14 business days after templating. Complex layouts may take closer to 3 weeks.
  • Laminate – Fabrication is fast. Many shops can complete the process in just a few business days.
  • Solid Surface/Butcher Block – Usually takes 5–10 days unless special finishes or custom inlays are requested.

If you’re ordering a unique color or rare slab, allow extra time for sourcing. Local suppliers may need to bring in the material from regional warehouses.

3. Removal of Existing Countertops

Before new counters can be installed, the old ones have to go. How long this takes depends on the material being removed:

  • Laminate – Quick to detach; usually a few hours.
  • Tile – Time-consuming because each piece must be broken out. This can add a full day or more.
  • Stone – Heavier and harder to remove, primarily if adhesive was used.

Most removals fall into a half-day to one full-day window. Professional crews are trained to minimize mess and damage to cabinets, which keeps the overall schedule on track.

4. Plumbing & Appliance Adjustments

Your countertops are tied directly to your plumbing and sometimes your appliances. Sinks, dishwashers, and cooktops must be disconnected before installation and reconnected afterward.

  • Disconnecting – Usually takes 1–2 hours.
  • Reconnecting – Often done the same day, but many homeowners schedule a plumber for the following day.

If you’re switching sink styles (from drop-in to farmhouse), expect a little more time for cabinet modifications. Depending on the complexity, this stage can add 1–2 days.

5. Installation Day(s)

The installation is usually the shortest stage — but also the most exciting. Once fabrication is complete, crews bring the finished slabs to your home, carefully set them in place, and seal the seams.

For most kitchens, the entire process takes just one full day. Larger kitchens or layouts that use heavy natural stone may take a little longer, sometimes extending into two days.

6. Total Countertop Installation Timelines by Material

As the list below shows, knowing how long each material takes to install gives you more information about making the right countertop choice.

  • Laminate – 3–7 days total. Quick install, most budget-friendly.
  • Quartz – 2–3 weeks total. Durable, custom fabrication needed.
  • Granite – 2–3 weeks total. Natural stone, sealing required.
  • Butcher Block – 1–2 weeks total. Must be oiled and maintained.
  • Solid Surface – 1–2 weeks total. Seamless look, easy to repair.

Top Countertop Design Experts in Littleton and Arvada

Kitchen countertops are the centerpiece of both beauty and functionality in any kitchen. If you’ve been living with the same design for years and are craving a refresh — without the high cost or extended downtime of a full remodel — replacing your countertops is one of the best upgrades you can make.

Kitchen and Bath by Design has designed and installed natural stone countertops for homeowners ranging from condos in Littleton to family homes in Arvada who wanted a fresh, new look.

Contact us online for a free estimate or at (720) 780-7124 to discuss your project. We welcome you to stop by our showroom, where our designers can guide you through countertop options and materials. Our passion is kitchen and bath design, so we’d love to discuss your project.

kitchen and bath logo
 | (720) 572-8212 | Website |  + posts

Family-owned for 20+ years offering high-quality, in-house fabricated marble and granite countertops and offer a wide array of comprehensive full remodeling services tailored to meet your diverse renovation needs. Visit our showroom for full-service remodeling. Fully insured, bilingual, and committed to excellence.

Posted By

Kitchen & Bath by Design

Previous Next
Close
Test Caption
Test Description goes like this